Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22JI0064

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22JI0064","CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS), BUUG PILOT CENTRAL SCHOOL, BRGY. POBLACION, BUUG, ZAMBOANGA SIBUGAY","Water Provision and Storage","Completed",338498.06,0,100,"Zamboanga Sibugay 1st DEO","Region IX","KS AGAD CONSTRUCTION (41208)","2022-11-25","2022-12-15",2021,"Regular Infra - GAA 2021 CSSP",7.72744,123.0634,"908302000","908300000"]
SHA-256
d698c418b1f47213f4da629efc36d1bedbb1d4e46c9cffe0ed02a0c9cd612f9a

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.