Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22KF0020

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22KF0020","CONSTRUCTION OF SLOPE PROTECTION ALONG BAROY BRIDGE, (UPSTREAM), STA. 0+000.00-STA. 0+280.00, BAROY, LANAO DEL NORTE","Flood Control and Drainage","Completed",39200000,0,100,"Lanao del Norte 1st DEO","Region X","LANAO BUILDER AND ENTERPRISES (15982)","2022-03-18","2022-11-25",2022,"Regular Infra - GAA 2022 OO-2",8.02112,123.78357,"1003503000","1003500000"]
SHA-256
3a1495bd0097b0ae1f7caa8006f9810ef50f850ae2fc4d06dd80a2d25241686e

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.