Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22LC0128

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22LC0128","CONSTRUCTION OF WATER SUPPLY SYSTEM (LEVEL II), BARANGAY MONTE DUJALI, SAN ISIDRO, DAVAO DEL NORTE","Water Provision and Storage","Completed",4900551.07,0,100,"Davao del Norte DEO","Region XI","JJR ACE CONSTRUCTION AND SUPPLY CORP. (44145)","2022-02-18","2022-06-16",2022,"Regular Infra - GAA 2022 CSSP",7.80834,125.65588,"1102324000","1102300000"]
SHA-256
4b402403ea663fd0e6fdf49c97b73bd39003418584de1abc9efb486d5a9d0152

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.