Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22LF0045

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22LF0045","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG HULID RIVER, STA. 0+000 - STA.0+100, CATEEL, DAVAO ORIENTAL","Flood Control and Drainage","Completed",9799417.14,0,100,"Davao Oriental 1st DEO","Region XI","RITZ BUILDERS CONSTRUCTION INC. (FORMERLY:RITZTOK CONSTRUCTION AND SUPPLY) (36070)","2022-02-21","2022-08-26",2022,"Regular Infra - GAA 2022 OO-2",7.76655,126.36675,"1102505000","1102500000"]
SHA-256
3f09c01b35cbd28540361703e0a63b84a6d786cc75b67ad3040650839645f81c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.