Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22LG0033

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22LG0033","CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SAN MIGUEL - WASON, BATOBATO, SAN ISIDRO, DAVAO ORIENTAL","Flood Control and Drainage","Completed",62725000,0,100,"Davao Oriental 2nd DEO","Region XI","LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)","2022-02-24","2023-01-04",2022,"Regular Infra - GAA 2022 CSSP",6.84195,126.08909,"1102510000","1102500000"]
SHA-256
b7824071f895ca971e40e36147c39dc6f22097b74785810eaee54c1ebeeebc67

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.