Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22NB0054

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22NB0054","CONSTRUCTION OF BANK PROTECTION ALONG WAWA RIVER, POBLACION SIBAGAT SECTION, AGUSAN DEL SUR, SIBAGAT, AGUSAN DEL SUR","Flood Control and Drainage","Completed",48968540.68,0,100,"Agusan del Sur 1st DEO","Region XIII","CM TAN CONSTRUCTION (28087)","2022-06-13","2023-09-07",2022,"Regular Infra - GAA 2022 OO-2",8.82044,125.69684,"1600314000","1600300000"]
SHA-256
690e07904dcc06c920359af1c1d4e76623be7c7053589da9b2bde8128b15a4c3

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.