Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22NG0028

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22NG0028","CONSTRUCTION OF BAOY RIVER FLOOD CONTROL STRUCTURE, BARANGAY SAN ISIDRO, GIGAQUIT, SURIGAO DEL NORTE / BRGY. SAN ISIDRO, GIGAQUIT, SURIGAO DEL NORTE","Flood Control and Drainage","Completed",39195621.87,0,100,"Surigao del Norte 2nd DEO","Region XIII","CHARLZ CONSTRUCTION, INC. (8709)","2022-02-11","2022-11-21",2022,"Regular Infra - GAA 2022 CSSP",9.5586,125.69938,"1606711000","1606700000"]
SHA-256
37d29c71827e2e94cb2cbafc5c86a6fe8e58f4f52040c302b0a91f3b70a3a3ec

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.