Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22PA0035

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22PA0035","BASIC INFRASTRUCTURE PROGRAM (BIP)-FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES CONSTRUCTION OF DALIMAG FLOOD CONTROL, BARANGAY DALIMAG, SAN ISIDRO, ABRA","Flood Control and Drainage","Completed",49497000,0,100,"Abra DEO","Cordillera Administrative Region","ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196)","2022-02-08","2022-06-10",2022,"Regular Infra - GAA 2022 CSSP",17.48636,120.59871,"1400121000","1400100000"]
SHA-256
817314634679ad4729d91bbf9e35c314d69e0f8fdc78bde8cc49cd15992da28a

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.