Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22PA0103

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22PA0103","BASIC INFRASTRUCTURE PROGRAM (BIP) FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES CONSTRUCTION OF PAGALA FLOOD CONTROL STRUCTURE (PHASE 2), BARANGAY PAGALA, BUCAY, ABRA","Flood Control and Drainage","Completed",49498000,0,100,"Abra DEO","Cordillera Administrative Region","739 BUILDERS (31174)","2022-06-20","2023-02-21",2022,"Regular Infra - GAA 2022 CSSP",17.56149,120.71509,"1400103000","1400100000"]
SHA-256
94f803cad43f6c5a2ccfa66eb8ddefa2afd0aadba6b353395e73a179d842e324

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.