Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22PA0126

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22PA0126","BASIC INFRASTRUCTURE PROGRAM (BIP) FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES CONSTRUCTION OF ABANG FLOOD CONTROL, BARANGAY ABANG, BUCAY, ABRA","Flood Control and Drainage","Completed",49496925.65,0,100,"Abra DEO","Cordillera Administrative Region","739 BUILDERS (31174)","2022-06-15","2023-01-26",2022,"Regular Infra - GAA 2022 CSSP",17.52141,120.72093,"1400103000","1400100000"]
SHA-256
050f7d43d09444b6dd2f3e106febe7881da6fa27761dcb997775e5ef7e7264d0

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.