Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22PA0127

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22PA0127","BASIC INFRASTRUCTURE PROGRAM (BIP) FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES CONSTRUCTION OF ABANG FLOOD CONTROL STRUCTURE (PHASE 2), BARANGAY ABANG, BUCAY, ABRA","Flood Control and Drainage","Completed",49497477.49,0,100,"Abra DEO","Cordillera Administrative Region","739 BUILDERS (31174)","2022-06-15","2023-01-26",2022,"Regular Infra - GAA 2022 CSSP",17.52239,120.72158,"1400103000","1400100000"]
SHA-256
875f49c4e9f42d340cca78ef60a5570ee00e270fd4875e6e3631431344bb54cd

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.