Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22PA0167

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22PA0167","SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF MADEGNAC BRIDGE PHASE II-A, ALAOA, TINEG, ABRA","Bridges","On-Going",46533224.46,0,99.15,"Abra DEO","Cordillera Administrative Region","PHESCO, INCORPORATED (145)","2022-07-19",null,2022,"Regular Infra - GAA 2022 CSSP",17.76491,120.83558,"1400125000","1400100000"]
SHA-256
9f048f58e6d938986c6d16ae44c17bdf63317cf679380bb55f63357d5c7af23b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.