Project 22PA0229
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22PA0229","SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES, CONSTRUCTION OF CORIBOT FLOOD CONTROL STRUCTURE, BARANGAY MUDENG, LA PAZ, ABRA","Flood Control and Drainage","Completed",94102968.15,0,100,"Abra DEO","Cordillera Administrative Region","739 BUILDERS (31174)","2022-12-28","2023-10-01",2022,"Regular Infra - GAA 2022 CSSP",17.62653,120.61921,"1400101000","1400100000"]
SHA-256
4ee0cf6d6e867e17983954b2dbfda68de2a1c54e0387069c97e41e0210cc4b15Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.