Project 22PB0010
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22PB0010","FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE-CONSTRUCTION OF BARREN RIVER (DOWNSTREAM) FLOOD CONTROL STRUCTURE, STA. 38+293-STA.39 +543 (L/S) BRGY. MALAMA, CONNER, APAYAO","Flood Control and Drainage","Completed",51762600,0,100,"Apayao 1st DEO","Cordillera Administrative Region","ASC CONSTRUCTION & CONCRETE PRODUCTS (26788)","2022-04-04","2023-05-30",2022,"Regular Infra - GAA 2022 OO-2",17.82276,121.26709,"1408102000","1408100000"]
SHA-256
01d49864630ef680dea1cf677a40446969f7c9a8fa3e39cdf17e3215a36b2848Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.