Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22PD0018

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22PD0018","CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION FACILITY/DRAINAGE SYSTEM ALONG BUED RIVER (TRIBUTARIES) A: STA. 0+190-STA. 0+640","Flood Control and Drainage","Completed",49000000,0,100,"Baguio City DEO","Cordillera Administrative Region","GOLDRICH CONSTRUCTION & TRADING (16489)","2022-04-10","2023-01-20",2022,"Regular Infra - GAA 2022 OO-2",16.37999,120.57615,"1401113000","1401100000"]
SHA-256
6e1b15bef848d8479412f7515782c986502625fe4b0484ee226125a528e2bb3e

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.