Project 22PI0050
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22PI0050","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAYUDAN RIVER, KABULAWAN - BUSILAC BILA - OTUCAN SUR, STA. 55+800 - STA. 56+480 (B.S.), BAUKO, MOUNTAIN PROVINCE","Flood Control and Drainage","Completed",96500000,0,100,"Mountain Province 1st DEO","Cordillera Administrative Region","MG SAMIDAN CONSTRUCTION (33234) / R.S. SEPIAN CONSTRUCTION & TRUCKING (20519)","2022-03-01","2022-10-06",2022,"Regular Infra - GAA 2022 OO-2",16.99466,120.87255,"1404402000","1404400000"]
SHA-256
4e9642d4a2444be813a47dffda2314e8900023b233ea14a1a5401d4209dcac52Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.