Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23AA0029

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23AA0029","CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AND FACILITIES ALONG LAOAG RIVER BASIN AND TRIBUTARIES, BARANGAY MANGITAYAG, PIDDIG, ILOCOS NORTE","Flood Control and Drainage","On-Going",47038749.71,0,98.03,"Region I","Region I","PERRC INC. (FORMERLY: P.E.R.R.C. CONSTRUCTION & DEVELOPMENT CORPORATION) (23869)","2023-04-17",null,2023,"Regular Infra - GAA 2023 OO-2",18.16023,120.70324,"102818000","102800000"]
SHA-256
53a63cd2dd14562d3affb9e8ebc2a53ab035ddf83e424e1fd74c5e743f5e359b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.