Project 23AA0126
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23AA0126","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAAG RIVER LEFT BANK, SITIO MABIGA EAST, BRGY PASALENG, PAGUDPUD, ILOCOS NORTE","Flood Control and Drainage","Completed",57899669.44,0,100,"Ilocos Norte 1st DEO","Region I","JLP CONSTRUCTION & SUPPLY (FORMERLY: JLP CONSTRUCT (26983)","2023-03-13","2023-08-18",2023,"Regular Infra - GAA 2023 OO-2",18.55079,120.94634,"102815000","102800000"]
SHA-256
c41a6da7e10388cfc90b62ac7db7f55a15799aa81529e9c5c43247607b09f0b5Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.