Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23AA0281

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23AA0281","SIPAG-FLOOD MIT STRUC PROT PUB INFRA/FAC-CONST OF F/C ALONG SAGSAGANG CREEK , BRGYS 1,2,3,4,23 & 24","Flood Control and Drainage","On-Going",29399532.21,0,96.83,"Ilocos Norte 1st DEO","Region I","ZEDIK BUILDERS (33330)","2023-05-08",null,2023,"Regular Infra - GAA 2023 CSSP",18.16146,120.65465,"102821000","102800000"]
SHA-256
d0c69845d1cf24ac906ee79f1851ec81d6a6a2ca4f001f35b66443c4c0a0dc2a

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.