Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23AD0042

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23AD0042","CONSTRUCTION /  MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF STA. MARIA RIVER CONTROL, BARANGAY NAGPANAOAN - SUBADI NORTE - SUBADI SUR, BURGOS, ILOCOS SUR","Flood Control and Drainage","Completed",48999357.69,0,100,"Ilocos Sur 2nd DEO","Region I","VILLAR GENERAL CONSTRUCTION AND SUPPLIES (22540)","2023-03-29","2024-07-31",2023,"Regular Infra - GAA 2023 OO-2",17.33299,120.49894,"102904000","102900000"]
SHA-256
163416b642d48266480577a77c63788ec67867c472f804d37a027fcf466b0bad

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.