Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23AF0104

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23AF0104","CONST. OF FLOOD CONTROL STRUCTURES ALONG THE ARINGAY RIVER BASIN, ARINGAY,LA UNION (PACKAGE 5), ARINGAY, LA UNION","Flood Control and Drainage","Completed",72334998.57,0,100,"La Union 2nd DEO","Region I","MG SAMIDAN CONSTRUCTION (33234)","2023-04-19","2024-02-11",2023,"Regular Infra - GAA 2023 OO-2",16.39024,120.36271,"103302000","103300000"]
SHA-256
b1f5a91794f37c543bc03c6ea4e7160b95378250ee3eac77de870a51273c9aef

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.