Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23B00048

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23B00048","OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: CONSTRUCTION OF  MISSING LINKS/NEW ROADS -TUGUEGARAO CITY BOULEVARD (PINACANAUAN BRIDGE 2 AND APPROACHES), PHASE 2","GAA 2023 OO-1","On-Going",285919061.33,0,82.48,"Region II","Region II","JC PALOMO CONSTRUCTION & CONSTRUCTION SUPPLY (37603) / ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762)","2023-05-25",null,2023,"Regular Infra - GAA 2023 OO-1",17.61398,121.73961,"201529000","201500000"]
SHA-256
53d6c0cc0af954bf33925c45fbf29c10ac703bafe67a697210c1999fb083d4a0

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.