Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23BC0074

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23BC0074","OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF MASI FLOOD CONTROL STRUCTURE ALONG PAMPLONA RIVER,","Flood Control and Drainage","Completed",40180000,0,100,"Cagayan 2nd DEO","Region II","GVDPM CONSTRUCTION CORP. (FORMERLY: ZM CONSTRUCTIO (9052)","2023-03-07","2023-10-09",2023,"Regular Infra - GAA 2023 OO-2",18.45867,121.33513,"201518000","201500000"]
SHA-256
10b98a763bc276f7943e4ba322e8d34126786341c01c58a42b6dee779187cb32

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.