Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23BG0126

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23BG0126","OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHAB OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF PINACANAUAN RIVER FLOOD CONTROL PROJECT, BRGY DIPUSU, SAN MARIANO","Flood Control and Drainage","Completed",96399710.65,0,100,"Isabela 3rd DEO","Region II","RRC CO. INC. (FORMERLY: R R C CONSTRUCTION) (24369)","2023-05-17","2024-02-19",2023,"Regular Infra - GAA 2023 OO-2",16.92834,122.02019,"203131000","203100000"]
SHA-256
f873d71e8728cc2a6a41e20fdb6fcf8b161c28250ec5a2a7b1ef933351de9fa3

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.