Project 23BH0081
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23BH0081","SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES - CONSTRUCTION OF DICAMAY 1 FLOOD CONTROL STRUCTURE SECTION 2,JONES, ISABELA","Flood Control and Drainage","Completed",48998504.16,0,100,"Isabela 4th DEO","Region II","DANYSONS CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: DANYSONS CONSTRUCTION) (25452)","2023-02-22","2023-12-02",2023,"Regular Infra - GAA 2023 CSSP",16.56882,121.70811,"203115000","203100000"]
SHA-256
4e8e158fc5e855e7b499a0a8feae2a88432517dcf3582d0dea6a699e214f1078Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.