Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23BH0088

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23BH0088","ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF ALICAOCAO FLOOD CONTROL PROJECT, CAUAYAN CITY, ISABELA","Flood Control and Drainage","Completed",29399982.46,0,100,"Isabela 4th DEO","Region II","EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) (13722)","2023-02-23","2023-08-12",2023,"Regular Infra - GAA 2023 OO-2",16.95593,121.77871,"203108000","203100000"]
SHA-256
da9dbb46e2afe9c3279f86af9d095b6e41c24717a8e0ed63130714effff329bb

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.