Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23BJ0031

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23BJ0031","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF FLOOD CONTROL ALONG BENAY RIVER, BAGUMBAYAN SECTION, DUPAX DEL SUR, NUEVA VIZCAYA","Flood Control and Drainage","Completed",96490357.25,0,100,"Nueva Vizcaya 2nd DEO","Region II","BRG CONSTRUCTION (21931)","2023-02-27","2023-10-13",2023,"Regular Infra - GAA 2023 OO-2",16.29716,121.08368,"205008000","205000000"]
SHA-256
ba2d8a7b1654c37babcb0b8abced46444e7441e2f28a3e7948abc4c09714ced0

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.