Project 23BJ0032
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23BJ0032","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF FLOOD CONTROL STRUCTURES AT COMON-LATAR SECTION, ARITAO, NUEVA VIZCAYA","Flood Control and Drainage","Completed",96499461.23,0,100,"Nueva Vizcaya 2nd DEO","Region II","AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) (16574) / KEVIN PAUL CONSTRUCTION (49090)","2023-02-10","2023-10-15",2023,"Regular Infra - GAA 2023 OO-2",16.2422,121.05084,"205002000","205000000"]
SHA-256
44f875a1d3ce038c8c665792299bcb0e6d0a01c9839ef184ff97c8b77dccc9a9Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.