Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23CC0222

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23CC0222","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALAGTAS RIVER, BARANGAY DALIG, BALAGTAS, BULACAN (K006+950 TO K007+148), BALAGTAS, BULACAN","Flood Control and Drainage","Completed",72372099.18,0,100,"Bulacan 1st DEO","Region III","STAR WILLIAM CONSTRUCTION (35938)","2023-03-28","2023-12-04",2023,"Regular Infra - GAA 2023 CSSP",14.83744,120.92379,"301415000","301400000"]
SHA-256
0b82b9e44a322313b2619f5f3a5db77e3a366b9430b6cda6bdcdbd43ac156cb3

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.