Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23CC0223

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23CC0223","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALAGTAS RIVER, BARANGAY SANTOL, BALAGTAS, BULACAN (K003+835 TO K004+033), BALAGTAS, BULACAN","Flood Control and Drainage","Completed",72373012.16,0,100,"Bulacan 1st DEO","Region III","STAR WILLIAM CONSTRUCTION (35938)","2023-03-28","2023-12-04",2023,"Regular Infra - GAA 2023 CSSP",14.85989,120.91986,"301415000","301400000"]
SHA-256
effdab4810a64aa82340e2df88a38f2dd3d608af2077521ffefe986359b4263a

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.