Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23CC0382

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23CC0382","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT BARANGAY SAN JOSE (PHASE II), CALUMPIT, BULACAN","Flood Control and Drainage","Completed",47022470.19,0,100,"Bulacan 1st DEO","Region III","C.E.M. CONSTRUCTION, INC. (36501)","2023-04-03","2023-11-28",2023,"Regular Infra - GAA 2023 CSSP",14.89056,120.7302,"305410000","305400000"]
SHA-256
c4c4a40ebe3b597b474624bf7458af9391b77fee680a4f86e6b3766a5eb9f8df

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.