Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23CC0484

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23CC0484","CONSTRUCTION OF BOCAUE RIVER FLOOD MITIGATION STRUCTURE (STA. 12+589 TO STA. 12+739) AT BRGY. BAMBANG, BOCAUE, BULACAN","Flood Control and Drainage","Completed",72374993.24,0,100,"Bulacan 1st DEO","Region III","WAWAO BUILDERS (46535)","2023-11-14","2024-02-12",2023,"Outside Infra - Unprogrammed Appropriations 2023",14.7724,120.92685,"301404000","301400000"]
SHA-256
5b712479dcfda493dfc7ae05529fd160bdef0dcad9731ef49fa5a4429005555b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.