Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23CC0513

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23CC0513","CONSTRUCTION OF REVETMENT AND REHABILITATION OF WATERWAYS ALONG HAGONOY RIVER AT BRGY. SAN ROQUE, HAGONOY, BULACAN PHASE II","Flood Control and Drainage","Completed",72371808.51,0,100,"Bulacan 1st DEO","Region III","TOPNOTCH CATALYST BUILDERS INC. (34061)","2023-12-21","2024-05-20",2023,"Outside Infra - Unprogrammed Appropriations 2023",14.81399,120.72761,"301409000","301400000"]
SHA-256
25a56e2fc07238190c8b85f963113359028c77f1cba79423b3dfc0f77c88be30

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.