Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23CC0550

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23CC0550","CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL PROJECT AND REHABILITATION OF WATERWAYS ALONG GUIGUINTO RIVER BRGY, MALIS GUIGUINTO, BULACAN STA. 004+360 TO STA. 004+560","Flood Control and Drainage","On-Going",72374711.62,0,79.28,"Bulacan 1st DEO","Region III","M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION) (20201)","2023-12-21",null,2023,"Outside Infra - Unprogrammed Appropriations 2023",14.84516,120.88186,"301408000","301400000"]
SHA-256
8784516897cfdbc84dbe2581f6a06a3dbbffa1be589645d90f4b97b988b025e5

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.