Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23CC0552

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23CC0552","CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL PROJECT AND REHABILITATION OF WATERWAYS ALONG GUIGUINTO RIVER BRGY. STA. CRUZ GUIGUINTO, BULACAN STA. 005+430 TO STA. 005+630","Flood Control and Drainage","Completed",72374576.48,0,100,"Bulacan 1st DEO","Region III","A.R.L. CONSTRUCTION (27645)","2023-12-21","2024-07-31",2023,"Outside Infra - Unprogrammed Appropriations 2023",14.84376,120.87773,"301408000","301400000"]
SHA-256
8c0e63458ad89896145226e6372a0682366cf63f04868e08a1e1d91a826e3a1f

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.