Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23CC0553

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23CC0553","CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL PROJECT AND REHABILITATION OF WATERWAYS AT TABANG (TRIBUTARY) GUIGUINTO, BULACAN STA. 004+150 TO STA. 004+350","Flood Control and Drainage","Completed",72374922.75,0,100,"Bulacan 1st DEO","Region III","WAWAO BUILDERS (46535)","2023-12-21","2024-08-16",2023,"Outside Infra - Unprogrammed Appropriations 2023",14.83646,120.86259,"301408000","301400000"]
SHA-256
389522d9f57a2751a62d0247c91387a9009c0f3d0d9a73a3dbabd9e7edd9b618

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.