Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23CD0023

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23CD0023","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUAYAN RIVER, MEYCAUAYAN SECTION (DOWNSTREAM), MEYCAUAYAN, BULACAN","Flood Control and Drainage","Completed",48990823.63,0,100,"Bulacan 2nd DEO","Region III","AZUL BUILDERS (21870)","2023-02-22","2024-04-02",2023,"Regular Infra - GAA 2023 OO-2",14.73512,120.92998,"301412000","301400000"]
SHA-256
c2101b97296f1cc8a71533f39833a5faded03f4e99628e221998f34db7c0fd5a

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.