Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23CD0050

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23CD0050","CONSTRUCTION OF FLOOD CONTROL MEYCAUAYAN TRIBUTARIES (RIGHT SIDE), NLEX-LANGKA- LIBTONG SECTION, MEYCAUAYAN, BULACAN","Flood Control and Drainage","Completed",39564000,0,100,"Bulacan 2nd DEO","Region III","AZUL BUILDERS (21870)","2023-03-13","2023-08-22",2023,"Regular Infra - GAA 2023 OO-2",14.74405,120.98362,"301412000","301400000"]
SHA-256
3609e37b67886ae7be2f3e7b4f21a66a1544160d82cf05e2f94d925020bb98e4

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.