Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23CD0121

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23CD0121","CONSTRUCTION OF FLOOD CONTROL STRUCTURE SANTA MARIA RIVER AND ITS TRIBUTARIES (BAGBAGUIN-BOLACAN), BAGBAGUIN, SANTA MARIA, BULACAN","Flood Control and Drainage","Completed",86846618.32,0,100,"Bulacan 2nd DEO","Region III","M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION) (20201)","2023-04-24","2024-03-31",2023,"Regular Infra - GAA 2023 OO-2",14.80592,120.94653,"301404000","301400000"]
SHA-256
64b10944d6835208af13cb7462c3f2963f520ea0a7b06cab376b3d9106400b44

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.