Project 23CG0146
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23CG0146","SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES - CONSTRUCTION OF FLOOD CONTROL WORKS UPSTREAM PORTION OF DALAQUITAN BRIDGE, STO. TOMAS, PAMPANGA","Flood Control and Drainage","Completed",91674954.68,0,100,"Pampanga 1st DEO","Region III","EDDMARI CONSTRUCTION & TRADING (20301)","2023-06-05","2024-02-22",2023,"Regular Infra - GAA 2023 CSSP",15.01532,120.71764,"305421000","305400000"]
SHA-256
c2dd0e09a2f9f863cce18a27cc27b0b0bd9b85aac3ecd5c1c0dcf53a4753b922Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.