Project 23CJ0003
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23CJ0003","FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF SLOPE PROTECTION WITH STEEL SHEET PILE FOUNDATION ALONG TARLAC RIVER CONTROL LEFT DIKE, BRILLANTE-RANG-AYAN SECTION (PACKAGE G","GAA 2023 OO-2","Completed",48141038.91,0,100,"Tarlac DEO","Region III","AC SOLIVEN CONSTRUCTION CORPORATION (FORMERLY: A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE) (19278)","2023-01-30","2023-07-18",2023,"Regular Infra - GAA 2023 OO-2",15.63698,120.53034,"306910000","306900000"]
SHA-256
c37a631ca000358de5916a931d9a5ad821ac4b9c8dbbc2354afe042d18999248Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.