Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23CJ0027

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23CJ0027","FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF SLOPE PROTECTION WITH STEEL SHEET PILE FOUNDATION ALONG TARLAC RIVER CONTROL LEFT DIKE, SAN JOSE-SAN BART","Flood Control and Drainage","Completed",70203784.94,0,100,"Tarlac DEO","Region III","R.R. RICAFORT CONSTRUCTION AND SUPPLIES (14402)","2023-02-06","2023-06-19",2023,"Regular Infra - GAA 2023 OO-2",15.55923,120.57525,"306916000","306900000"]
SHA-256
bc8860f5ca66eba481e4554df85a39bc9d21eb52e47aa32cdcd358215159a54c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.