Project 23CJ0028
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23CJ0028","SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES CONSTRUCTION OF SLOPE PROTECTION WITH STEEL SHEET PILE FOUNDATION ALONG TARLAC RIVER CONTROL RIGHT DIKE, AYSON TO DICOLOR","Flood Control and Drainage","Completed",47530047.71,0,100,"Tarlac DEO","Region III","R.R. RICAFORT CONSTRUCTION AND SUPPLIES (14402)","2023-01-30","2023-06-23",2023,"Regular Infra - GAA 2023 CSSP",15.61597,120.554,"306906000","306900000"]
SHA-256
9314d83e6b6f071edcf376fb06f63dcd9db74567e74dffb8319651abb844a60eHash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.