Project 23CJ0138
DPWH infrastructure contract
This contract as an OC4IDS project record, the infrastructure standard used by OpenGovChain. Download: JSON
{
"id": "oc4ids-pisoscan-dpwh-23CJ0138",
"title": "BASIC INFRASTRUCTURE PROGRAM (BIP) FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES CONSTRUCTION OF SLOPE PROTECTION WITH STEEL SHEET PILE FOUNDATION ALONG TARLAC RIVER CONTROL LEFT DIKE, SAN ISIDRO - STA MARIA SECTION, TARLAC CITY",
"sector": [
"Flood Control and Drainage"
],
"status": "completed",
"publicAuthority": {
"name": "DPWH Tarlac DEO"
},
"period": {
"startDate": "2023-04-11",
"endDate": "2023-07-18"
},
"budget": {
"amount": {
"amount": 57419383.62,
"currency": "PHP"
}
},
"locations": [
{
"geometry": {
"type": "Point",
"coordinates": [
120.59011,
15.51444
]
}
}
],
"parties": [
{
"name": "HIGH STRENGTH DEV. CORPORATION (31976) / RCUBE ENGINEERING SERVICES",
"roles": [
"supplier"
]
}
],
"contractingProcesses": [
{
"id": "23CJ0138",
"summary": {
"title": "BASIC INFRASTRUCTURE PROGRAM (BIP) FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES CONSTRUCTION OF SLOPE PROTECTION WITH STEEL SHEET PILE FOUNDATION ALONG TARLAC RIVER CONTROL LEFT DIKE, SAN ISIDRO - STA MARIA SECTION, TARLAC CITY",
"status": "closed",
"contractValue": {
"amount": 57419383.62,
"currency": "PHP"
}
}
}
],
"pisoscan": {
"dpwhStatus": "Completed",
"physicalProgressPercent": 100,
"fundingSource": "Regular Infra - GAA 2023 CSSP",
"sourceDataset": "DPWH contract list via BetterGov.ph",
"sha256": "e3885ea6473105ee66fc679ce02c949ab88e020b634915df10546c43245c3746"
}
}