Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23CJ0319

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23CJ0319","CONSTRUCTION OF FLOOD CONTROL STRUCTURES AT PRINCIPAL RIVER, RIO CHICO RIVER, VICTORIA, TARLAC","Flood Control and Drainage","Completed",46802969.01,0,100,"Tarlac DEO","Region III","AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP. ([REVOKED] 49129)","2023-12-14","2024-07-26",2023,"Outside Infra - Unprogrammed Appropriations 2023",15.58766,120.69939,"306917000","306900000"]
SHA-256
ed51265b4825a57b741073ee4debc3fcda541b132797423d1f0fbbc2319a50a2

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.