Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23CL0041

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23CL0041","CONSTRUCTION OF FLOOD CONTROL AT LAUIS RIVER, PHASE II, CANDELARIA, ZAMBALES","Flood Control and Drainage","On-Going",96491562.46,0,74.68,"Zambales 1st DEO","Region III","HGG BUILDERS & SUPPLY (17824)","2023-02-28",null,2023,"Regular Infra - GAA 2023 CSSP",15.59618,119.92682,"307103000","307100000"]
SHA-256
068f314d78df2f06c3f3778b25419f1605f770b5b7df282129df4c91511f64de

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.