Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23CL0042

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23CL0042","REHABILITATION OF FLOOD CONTROL STRUCTURE AT BUCAO RIVER, UPSTREAM, PHASE VI, BOTOLAN, ZAMBALES","Flood Control and Drainage","On-Going",96496862.27,0,53.87,"Zambales 1st DEO","Region III","GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC. ([REVOKED] 45914)","2023-02-28",null,2023,"Regular Infra - GAA 2023 OO-2",15.26193,120.03728,"307101000","307100000"]
SHA-256
731b033d75adc8356a9ca86f8f7a09807eb711673ec4b12afedc6707bde5d487

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.