Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23CL0045

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23CL0045","CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT PAMATAWAN RIVER, PHASE I, SAN MIGUEL, SAN ANTONIO, ZAMBALES","Flood Control and Drainage","Completed",94569740.94,0,100,"Zambales 1st DEO","Region III","HPL GENERAL CONSTRUCTION (22289)","2023-02-22","2024-01-17",2023,"Regular Infra - GAA 2023 OO-2",14.94474,120.06437,"307109000","307100000"]
SHA-256
d25f3a0dd4360e5f02557671b77ac27518e98b848acbda336c9fa8c75cc719cf

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.