Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23CL0133

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23CL0133","CONSTRUCTION OF TAMBAC BRIDGE (PHASE I), SITIO TAMBAC, BARANGAY PALANGINAN, IBA, ZAMBALES","Bridges","On-Going",49004932.14,0,90.25,"Zambales 1st DEO","Region III","R.A. PAHATI CONST. & SUPPLY, INC. (35843)","2023-05-29",null,2023,"Regular Infra - GAA 2023 CSSP",15.32373,120.00667,"307105000","307100000"]
SHA-256
81c32b068d08be399bc9dc47bece5e090b49913980061e977cc9d72b2aab0dd1

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.