Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23DI0148

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23DI0148","CONSTRUCTION OF FLOOD PROTECTION STRUCTURE PHASE 1, (BINAN-CARMONA BOUNDARY), BINAN SIDE, BINAN CITY, LAGUNA","Flood Control and Drainage","Completed",96496542.37,0,100,"Laguna 2nd DEO","Region IV-A","M.T. MALIUANAG CONSTRUCTION SERVICES (45605)","2023-08-09","2024-03-04",2023,"Regular Infra - GAA 2023 OO-2",14.26888,121.03984,"402118000","402100000"]
SHA-256
b0529431bbfc265cb5cad3a4cc59aa64a666c6c7e00898a6375ae5300eddf302

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.